Cell Grading
Stage 1: Cell capacity measurement, Y-column data processing and voltage analysis
Stage 1: Cell capacity measurement, Y-column data processing and voltage analysis
Stage 2: HIOKI ST3561A integration and real-time data collection
| Time | Cell Serial | Type | Voltage (V) | Current (A) | Resistance (Ω) | Status | Actions |
|---|---|---|---|---|---|---|---|
| No sorting data available. Start sorting process above. | |||||||
Stage 3: Cell verification with voltage and IR measurement
Stage 3: Cell verification with capacity & V/IR checks
| Time | Serial | Cap (mAh) | Volt (V) | IR (mΩ) | BMS | Status |
|---|---|---|---|---|---|---|
| No scan data yet. Click “Start Scanning”. | ||||||
Stage 4: Module-based barcode creation (56-cell modules)
Stage 4: Module-based barcode creation (56-cell modules)
| Module ID | Barcode | Cells | Voltage | IR | Status |
|---|---|---|---|---|---|
| No modules yet. Load and build to begin. | |||||
Stage 5: Battery Management System testing with serial mapping
| BMS_Serial | Test_Status |
|---|
| Module ID | Barcode | BMS Serial | Test Status | Module Voltage | Module IR | Result |
|---|---|---|---|---|---|---|
| Import BMS results to see data here. | ||||||
Module + BMS + IoT testing with cloud integration and FG number generation
| Time | FG Number | Module | BMS | IoT | Result | Actions |
|---|---|---|---|---|---|---|
| No test results yet. Complete a test to see data here. | ||||||
End-of-line testing with serial-based Excel import and automated report generation
| Time | FG Number | Capacity (Ah) | Performance | Safety | Result | Report | Actions |
|---|---|---|---|---|---|---|---|
| No functional test results yet. | |||||||
Supported format: .XLSX
| Pack Barcode | Module | BMS | IoT | Time |
|---|---|---|---|---|
| No packs assembled yet. | ||||
Quality analysis and compliance monitoring
Quality Control dashboard will be implemented here...
Complete component traceability and investigation
Serial Tracking system will be implemented here...
Production reports and analytics
Reports dashboard will be implemented here...
Quality investigation and root cause analysis
Reverse Engineering tools will be implemented here...
System configuration and customization
Settings panel will be implemented here...
User accounts and access control
User Management system will be implemented here...
Hardware settings and calibration
Equipment Configuration will be implemented here...